Utility Work to Impact Intersection of Jolly Road and Cedar Street | 1/19/2021 4:40 PM |
Downtown Road Closures Sunday, January 17 | 1/16/2021 8:55 PM |
Sledding Hill at Ranney Park to be Closed for Construction Project | 1/11/2021 12:48 PM |
Segment of Lansing River Trail to be Closed for Utility Construction | 1/4/2021 4:36 PM |
Intersection of Cedar Street and Jolly Road to be Closed for Utility Work | 12/21/2020 2:53 PM |
One Southbound Traffic Lane of Cedar Street to be Closed for Concrete Work | 12/14/2020 10:08 AM |
River Trail Closures to be Removed for the Season | 11/24/2020 12:06 PM |
Marshall St. and WB Traffic Lanes of Michigan Ave. to be Closed for Event | 11/13/2020 3:21 PM |
City of Lansing Announces Launch of Downtown Bike Lockers | 11/10/2020 3:53 PM |
UPDATE: N. Grand River Avenue to be Closed for Road Work | 11/5/2020 1:08 PM |
N. Grand River Avenue to be Closed for Road Work | 11/4/2020 8:16 AM |
Right Two Lanes on Capitol Avenue to be Closed for Christmas Tree Placement | 10/30/2020 3:33 PM |
BWL to Close NB Traffic Lane of Washington Avenue for Water Main Work | 10/28/2020 8:07 AM |
Pine Street Lane Reduction South of Saginaw Street | 10/27/2020 2:40 PM |
Left Traffic Lane of Southbound MLK Jr. Blvd. to be Closed for Construction | 10/26/2020 2:59 PM |
BWL to Close Segment of Tecumseh River Rd. for Emergency Valve Replacement | 10/26/2020 1:17 PM |
S. Pennsylvania Avenue to be Closed to Southbound Traffic for Sewer Repairs | 10/23/2020 2:22 PM |
BWL to Close Intersection of Willow/Cawood Street for Final Paving | 10/16/2020 11:56 AM |
UPDATE: Consumers Project at Substation to Impact Bike Lanes and Sidewalks | 10/14/2020 1:47 PM |
Cavanaugh Road to be Closed to Westbound Traffic for Sewer Repairs | 10/8/2020 1:19 PM |
North Grand River Avenue to be Closed for Utility Work | 10/7/2020 1:29 PM |
UPDATE: Segment of Lansing River Trail to be Detoured for Utility Work | 10/5/2020 3:26 PM |
River Trail Bridges to be Closed for Rehabilitation | 9/28/2020 2:09 PM |
Bridge Over Grand River to be Closed for Rehabilitation | 9/28/2020 7:33 AM |
BWL to Close Intersection of Willow Street/Cawood Street for Construction | 9/21/2020 2:25 PM |
BWL to Close E. South Street for Emergency Boiler Infrastructure Project | 9/18/2020 3:08 PM |
South Washington Avenue Railroad Tracks to be Closed for Maintenance | 9/11/2020 2:06 PM |
Jolly Road to be Closed for Milling and Resurfacing | 9/11/2020 11:15 AM |
Shepard Street to be Closed for Milling and Paving | 9/9/2020 1:09 PM |
May Street and Prudden Street Intersection to be Closed for Construction | 9/3/2020 12:19 PM |
BWL to Close Intersection of Willow Street and Cawood Street | 9/2/2020 1:49 PM |
City of Lansing Parks and Recreation Parking Lot Upgrades | 8/28/2020 3:50 PM |
Moores River Drive to be Closed for Restoration and River Trail Repair | 8/26/2020 2:00 PM |
Segment of the Lansing River Trail to be Detoured for Utility Construction | 8/26/2020 11:01 AM |
Reo Road to be Closed for Road Reconstruction and Repairs | 8/21/2020 1:31 PM |
Segment of Turner Road to be Closed for Old Town Art Festival | 8/19/2020 1:28 PM |
BWL to Close Westbound Traffic Lanes on E. Jolly Road for Concrete Repairs | 8/7/2020 3:25 PM |
BWL to Close Traffic Lane at Grand Avenue and St. Joseph Street | 8/7/2020 12:50 PM |
Sheffield Blvd. and Windward Dr. to be Closed for Reconstruction and Repair | 8/4/2020 2:54 PM |
UPDATE: Paving and Minor Restoration of Lansing River Trail | 7/31/2020 10:38 AM |
Segment of River Trail to be Closed for Paving and Minor Restoration | 7/31/2020 10:20 AM |
E. Hazel Street to be Closed for Paving | 7/31/2020 8:02 AM |
BWL to Close Ottawa Street for Emergency Repair of Water Main | 7/29/2020 3:51 PM |
BWL to Close Kalamazoo Street for Water Main Construction | 7/28/2020 3:10 PM |
Beech Street and E. Elm Street to Close for Utility Work | 7/28/2020 11:07 AM |
Consumers Energy Project to Impact Bike Lanes and Sidewalk on E. Jolly Road | 7/28/2020 9:31 AM |
Beech Street and E. Elm Street to be Closed for Utility Work | 7/20/2020 3:58 PM |
BWL to Close Westbound Lane on W. Mt. Hope Highway for Utility Construction | 7/20/2020 9:59 AM |
Massachusetts Avenue to be Closed for Reconstruction and Repairs | 7/14/2020 2:19 PM |
Tecumseh Park's Parking Lot and Area Around River to be Closed for Repairs | 7/13/2020 1:15 PM |
Aurelius Road and Malcolm X Street Connector to be Closed for Sewer Repairs | 7/9/2020 10:49 AM |
Michigan Avenue to be Closed for Crane Work | 7/7/2020 9:46 AM |
UPDATE: BWL to Reduce W. Cavanaugh Road to One Traffic Lane | 7/6/2020 1:51 PM |
BWL to Reduce W. Cavanaugh Road to One Traffic Lane | 7/6/2020 11:37 AM |
Segment of the River Trail in Scott Woods to be Closed | 7/1/2020 3:50 PM |
BWL to Close Cawood Street for Water Main Installation | 7/1/2020 1:50 PM |
Beaujardin Drive to be Closed for Resurfacing and Repairs | 6/29/2020 12:02 PM |
Enterprise Drive to be Closed for Road Reconstruction | 6/25/2020 12:33 PM |
Segment of the Lansing River Trail to be Closed for Construction | 6/24/2020 12:31 PM |
Jolly Road & Aurelius Road Intersection to be Closed for Resurfacing | 6/23/2020 11:00 AM |
Shiawassee and Capitol to be Closed for "Dribbling 4 Justice & Unity" Event | 6/18/2020 2:44 PM |
Jolly Road Intersection to be Closed for Road Resurfacing | 6/18/2020 11:12 AM |
North Grand River Avenue to be Closed for Utility Work | 6/18/2020 8:06 AM |
Clemens Avenue to be Closed for Asphalt Repair | 6/17/2020 4:30 PM |
Segment of Lansing River Trail in N. Lansing to be Closed for Construction | 6/15/2020 2:34 PM |
Segment of Kalamazoo Street to be Closed for Lansing Graduation | 6/13/2020 9:27 AM |
Hamelon St. and Scarborough Rd. to be Closed for Resurfacing and Repairs | 6/11/2020 10:14 AM |
BWL to Close One Southbound Traffic Lane on Cedar Street for Water Service | 6/10/2020 11:51 AM |
Intersections Along Michigan Avenue to be Closed for March | 6/10/2020 8:53 AM |
UPDATE: CART Starts Every Other Week Collection of Yard Waste | 6/9/2020 11:09 AM |
CART Starts Every Other Week Collection of Yard Waste | 6/9/2020 10:28 AM |
Segment of the Lansing River Trail to be Closed for Repairs | 6/8/2020 10:05 AM |
BWL to Reduce Traffic to One Lane on E. Miller Road | 6/2/2020 11:01 AM |
BWL to Reduce Traffic to One Lane on E. Mount Hope Avenue | 5/28/2020 4:00 PM |
BWL to Close Westbound E. Hazel Street for Water Service Replacement | 5/27/2020 3:58 PM |
Aurelius Road to be Closed for Road Resurfacing | 5/19/2020 2:00 PM |
UPDATE: Cavanaugh Road to be Closed for Sewer Repairs | 5/14/2020 11:30 AM |
UPDATE: Douglas Avenue to be Closed for Sewer Repairs | 5/14/2020 10:15 AM |
Update: Lane Reductions Approaching MLK Jr. Boulevard and Sheridan Road | 5/11/2020 1:30 PM |
MDOT to Reduce Lane on Homer Street | 5/7/2020 3:01 PM |
Douglas Avenue to be Closed for Sewer Repairs | 5/6/2020 12:01 PM |
Cavanaugh Road to be Closed for Sewer Repairs | 5/5/2020 3:00 PM |
MDOT M-99 (MLK Jr. Blvd.) Pavement Repairs | 5/5/2020 1:00 PM |
Lane Reductions Approaching MLK Boulevard and Sheridan Road | 4/30/2020 2:08 PM |
BWL to Close Southbound Lane on S. MLK Jr. Blvd. for Street Repairs | 4/30/2020 12:21 PM |
BWL to Close Eastbound Lane of Delta River Drive Update | 4/29/2020 9:22 AM |
BWL to Close Eastbound Lane of Delta River Drive to Replace Overhead Lines | 4/29/2020 8:05 AM |
East Edgewood Boulevard Closed to Repair Catch Basin Frames and Structures | 4/22/2020 4:01 PM |
East Edgewood Boulevard Closed to Repair Catch Basin Frames and Structures | 4/22/2020 2:01 PM |
Delta River Drive to be Closed for Rehabilitation Construction | 4/9/2020 11:01 AM |
Closure of E. Kalamazoo St. to Replace Water Main Breaks | 4/2/2020 8:31 AM |
Update: Lenawee Street and Townsend Street Intersection Closure | 4/1/2020 1:31 PM |
Lenawee and Townsend Intersection Closure to Replace Catch Basins | 3/26/2020 2:00 PM |
Forest Road Closed to Through Traffic for Underground Utility Project | 3/26/2020 11:00 AM |
East Hazel Street Closure to Replace Water Service | 3/14/2020 11:31 AM |
Reduced Lane on Mount Hope Avenue | 3/9/2020 2:01 PM |
Lane Closure on Capitol Avenue for CATA Census Awareness Campaign | 3/3/2020 12:00 PM |
Street Closure for the Brr, Beards and Brews - A Lumberjack Festival | 2/25/2020 3:54 PM |
Closure of Michigan Avenue Between Cedar Street and Grand Avenue | 2/24/2020 2:53 PM |
Thanksgiving Capitol Area Recycling & Trash | 11/27/2019 12:00 PM |
Thanksgiving Capitol Area Recycling & Trash | 11/22/2019 8:00 AM |
200 North Washington Square to Close for Silver Bells Event | 11/19/2019 12:00 PM |
Silver Bells 5K Run/Walk 2019 | 11/19/2019 12:00 PM |
Silver Bells in the City 2019 | 11/19/2019 11:31 AM |
Silver Bells in the City 2019 | 11/19/2019 11:00 AM |
200 North Washington Square to Close for Silver Bells Event | 11/19/2019 8:00 AM |
Capital Area Recycling & Trash | 11/18/2019 8:01 AM |
Lane Closure for Steam Work on S. Capitol Avenue | 11/15/2019 5:00 PM |
Cedar St. BWL | 10/25/2019 7:30 AM |
Capitol Avenue Repaving | 10/21/2019 4:01 PM |
MLK JR. BLVD PAVING | 10/18/2019 4:26 PM |
Capitol Avenue Closure | 10/18/2019 3:51 PM |
Miller Road Closure | 10/18/2019 9:00 AM |
Miller Road Closure | 10/17/2019 2:00 PM |
Food Truck Mashup at Cowley Stadium Lane Restrictions and Closures | 10/16/2019 6:01 AM |
MSABC Lane Restrictions and Closures | 10/9/2019 7:00 AM |
Street Closure on Washtenaw Street | 9/25/2019 11:22 AM |
Michigan Auto Insurance March Travel Lane Restrictions | 9/23/2019 8:38 AM |
Street Closures for the Blues Fest in Old Town | 9/19/2019 1:32 PM |
Capital City River Run 5K and Half Marathon | 9/19/2019 7:00 AM |
Prime Music Festival Travel Lane Restrictions | 9/18/2019 12:32 PM |
BWL to Close Southgate Ave. for Water Main Replacement | 9/13/2019 7:00 AM |
Lane Closure on Walnut Street and Street closure on Washtenaw Street | 9/12/2019 12:59 PM |
Lane Reductions for the 9/11 Remembrance Memorial | 9/9/2019 9:35 AM |
City Trash, Recycling and Yard Waste Collections Delayed Due to Labor Day | 9/2/2019 7:00 AM |
BWL to Close Northbound S. Jenison Ave. | 8/23/2019 7:01 AM |
Turner Street to Close for Old Town Art Feast | 8/15/2019 7:00 AM |
Lane Reductions With Modified Traffic Shift on MLK Jr. Blvd. / M-99 | 8/14/2019 8:01 AM |
Lane Restrictions on Capitol Avenue for Roadway Surface Restoration | 8/14/2019 7:30 AM |
Collins Road to Close South of Dunckel Road for Water Main Installation | 8/8/2019 1:20 PM |
Street Closing for Dewpoint Client Appreciation Mixer | 8/7/2019 4:02 PM |
Lansing Board of Water and Light Hometown 5K | 8/7/2019 10:33 AM |
West Mount Hope Avenue to Close for Construction | 8/6/2019 8:08 AM |
East Mount Hope Avenue to Close for Construction | 8/6/2019 8:07 AM |
Street Closure for the St. Casimir's "Come to the River Event" | 8/2/2019 1:54 PM |
Turner Street Closed for Road Construction | 8/1/2019 8:51 AM |
Street Closures for the Jazz Fest in Old Town | 7/30/2019 8:00 AM |
Westbound Edgewood Boulevard to Close for Street Restoration | 7/29/2019 12:36 PM |
MDOT to remove Sheridan Road Skywalk over Old US-27 July 27 | 7/25/2019 2:20 PM |
BWL to Close Lane on E. Shiawassee St. for Water Main Repairs | 7/24/2019 3:47 PM |
Westbound Edgewood Boulevard To Close For Water Main Installation | 7/12/2019 9:30 AM |
BWL to Close Lane on North Capitol Avenue For Steam Work | 7/11/2019 3:02 PM |
Downtown Street Closed For Michigan Running Foundation Run For Fame 5K | 7/11/2019 8:56 AM |
Street Closures For The Old Town Scrap Fest | 7/10/2019 8:01 AM |
Sewer Separation Project Lane Reductions & Traffic Shift on MLK Jr. Blvd. | 7/3/2019 3:42 PM |
BWL to Close S. Capitol Ave. for Steam and Water Main Improvements | 7/1/2019 8:01 AM |
BWL to Reduce Traffic Along S. Pennsylvania Ave. for Pole Replacements | 6/24/2019 8:48 AM |
Common Ground Music Festival to Close Downtown Streets | 6/20/2019 9:50 AM |
BWL to Make Road Repairs Following Water Main Breaks | 6/17/2019 2:58 PM |
Downtown Streets Closed for the Michigan Pride Festival, Parade and Rally | 6/13/2019 10:20 AM |
South Washington Avenue Closed for Lansing Beer Festival in Reo Town | 6/13/2019 8:45 AM |
Street Closings & Lane Restrictions for the Juneteenth Parade | 6/13/2019 8:39 AM |
Miller Road Closed for Road Construction | 6/6/2019 4:05 PM |
BWL to Begin Repairs on S. Capitol Ave. for Steam & Water Main Improvements | 6/5/2019 2:51 PM |
Downtown Road Closure to Accommodate Sparrow Foundation Dapper Dads | 6/3/2019 1:25 PM |
Hawk Island Triathlon | 5/31/2019 11:54 AM |
CART Collections Delayed Due to Memorial Day | 5/23/2019 9:01 AM |
BWL to Close NB S. Washington Ave. May 17 | 5/15/2019 9:00 AM |
BWL to Begin Construction on W Lenawee St. May 15 | 5/10/2019 1:00 PM |
BWL to Close N Capitol Ave. Starting May 13 | 5/10/2019 9:00 AM |
Aurelius Road to Close for Railroad Grade Repairs | 5/9/2019 12:45 PM |
Cesar Chavez and Washington Avenue Intersection Closure | 4/24/2019 10:10 AM |
BWL to Close E. Cavanaugh Rd. for Water Main Replacements | 4/22/2019 9:00 AM |
W Mt. Hope Avenue Detour | 4/11/2019 3:21 PM |
2019 Recycle Rama Lane Restrictions | 4/11/2019 9:01 AM |
Seasonal Weight Restrictions Effective Until Monday, April 8 | 4/5/2019 3:37 PM |
10th Annual Recycle Rama to Be Held April 13th | 4/3/2019 10:00 AM |
Westbound Kalamazoo St. to Close West of Townsend St. | 3/27/2019 2:07 PM |
Yard Waste Collection to Begin Week of April 15, 2019 | 3/27/2019 12:36 PM |
Seasonal Weight Restrictions Now in Effect | 3/11/2019 3:41 PM |
Turner Street Closed 2/23 for Brrs, Beards and Brews Festival | 2/20/2019 3:38 PM |
BWL to Close E. Hodge Ave. to Replace Water Main Valve | 2/20/2019 1:24 PM |
BWL to Close NB Pennsylvania Ave. at Mt. Hope Ave. to Replace Fire Hydrant | 2/15/2019 2:17 PM |
BWL to Close NB Pennsylvania Ave. at Mt. Hope Ave. to Replace Fire Hydrant | 2/8/2019 10:20 AM |
CART Collections Delayed Due to Martin Luther King Jr. Day | 1/18/2019 10:38 AM |
Christmas Tree Curbside Collection in the City of Lansing | 1/2/2019 11:01 AM |
Street Closings for the Gubernatorial Inauguration | 12/28/2018 11:00 AM |
City Trash and Recycling Collections Delayed Due to the New Year Holiday | 12/27/2018 10:00 AM |
City Trash and Recycling Collections Delayed Due to Christmas Holiday | 12/20/2018 1:02 PM |
Downtown Street Closures for Turkey Trot 5k | 11/21/2018 10:00 AM |
City Trash, Recycling Yard Waste Collections Thanksgiving Delay | 11/20/2018 1:00 PM |
Seasonal Yard Waste Collection Ends the Week of November 26 | 11/19/2018 11:00 AM |
Silver Bells 5K Street Closures and Lane Restrictions | 11/15/2018 10:00 AM |
Silver Bells in the City Downtown Street Closures and Lane Restrictions | 11/13/2018 1:30 PM |
200 North Washington Square to Close for BWL Toy Mill | 11/13/2018 9:30 AM |
BWL to Close Lane on S. Grand Ave. for Steam Work | 10/24/2018 12:01 PM |
BWL to Close Streets in Eastside Neighborhood for Valve Repair | 10/19/2018 10:26 AM |
Pleasant Grove Road to be Closed at Reo Road for Paving | 6/14/2018 3:44 PM |
BWL to Continue Road Repairs Following Winter Water Main Breaks | 6/11/2018 3:43 PM |
Pleasant Grove Rd. & Reo Rd. Intersection to be closed for Water Main Work | 6/8/2018 2:21 PM |
Washington Square Closure for Sparrow Foundation Dapper Dads Fashion Show | 6/5/2018 10:26 AM |